A clearer way to manage every project.

Architecture studio, ongoing

One system for the whole project, from first meeting to handover, with the client able to see where things stand without being told.

The studio's project timeline: seven projects, each with its phases as bars, how far each phase has got, and today's date marked across all of them

How it worked until then

Progress lived across several different apps. There was no single place that showed where a project actually stood, so keeping the client informed depended on somebody remembering to do it.

Updates went out when there was time, not when something changed. The gaps had a cost: a client who should have been chased sometimes wasn't, because nobody could see that they were due.

The parts that mattered

  • The whole project in one place

    Every project runs through defined phases, from the first meeting through concept and drawings to handover. Each phase carries its own checklist with an owner against every task, so what is done, what is next and whose turn it is are all visible at a glance.

  • The client sees it themselves

    Instead of the architect calling or messaging, the client has their own view of the project: how far along it is, what has been delivered and what is coming next. The update happens because the work happened, not because someone remembered to write it.

  • Nothing reaches the client unapproved

    Updates are assembled inside the tool: pick the drawings or renders, add a note, publish. The architect stays in control of the wording, and the client sees nothing until it is sent.

  • Payments tracked against the work

    Each payment stage sits alongside the phase it belongs to, so an invoice that is prepared but unsent is visible rather than forgotten. The thing that used to slip quietly is now simply on screen.

A project update as the client sees it: the current phase, the expected date of the next meeting, and the latest note with a floor plan attached
What the client sees: the phase their project is in, roughly when the next meeting is, and the latest update with the drawing attached.
Project types the studio defines, such as new family house or flat renovation, each listing its projects and where they stand
Project types the studio sets up itself. Each one lists its projects and where they stand.

What changed

The status call largely went away. The client can see where things stand without asking, and the architect can see which projects need pushing, including the ones that would previously have slipped.